Reconstruction of the control room DPD, North quarry - EPRII

2/24 – 6/24
CEZ Energetic Products, s.r.o.
Místo realizace:
Prunéřov Power Plant

The task for this contract was to renovate the DPD control room at the Prunéřov power plant. It was necessary to dismantle the existing electrical switchboard. This switchboard was replaced by a new switchboard, which we produced in our workshop in Přelouč. There were many old unused cables in the control room, which had to be dismantled and environmentally disposed of.

The control room has undergone a complete renovation. We repaired the plaster, repainted, made new floors and set up new furniture.

New monitors were placed in the new workplace and the visualization was modified by VALMET. A video telephone including an electric doorman has been added.

No items found.

NÁVRH TECHNICKÉHO ŘEŠENÍ

Design activity

PROJECT MANAGEMENT

Tangible supplies

Manufacture of distribution boards

SW CREATION

ASSEMBLY ACTIVITIES

COMMISSIONING

REVISION ACTIVITIES

SERVIS 24/7

Systémy řízení

Mar

Elektro

This seriously

worth noting
You have given us your trust here

PROJECTS WE’RE PROUD OF

We have successfully implemented over 6,000 projects in the energy sector, chemical industry, water management and other industries.

Location

Blog title heading will go here

SVÚM a.s. Čelákovice

Centrifugal machine 550 SD

Synthesia a.s., Pardubice

Greening of the TG14 energy source

ORLEN Unipetrol, Kralupy nad Vltavou Refinery

Blending SAF into the hydroprocessed aviation kerosene stream

Vysoké Chvojno

Vysoké Chvojno Water Tank – Electrical and I&C

Production plant Častolovice

Expansion of production - a new line for the production of mineral wool

Prunerov Power Plant

Camera system, Severní lom - EPRII

Projekt číslo 0380000695 byl financován Evropskou unií
„Podpora kreativity ve společnosti SUMO s.r.o.“ – Marketingová strategie a webdesign firemních webových stránek.